| Table 1: Overview | ||
|---|---|---|
| 2003-04 | Total | |
| REFERRALS | ||
| Total referrals received |
292
|
1232
|
| Referrals withdrawn or lapsed before decision |
8
|
21
|
| Referrals decisions made (following reconsiderations) |
286
|
1182
|
| Approval required - controlled actions |
54
|
290
|
| Approval not required - action to be taken in particular manner |
38
|
167
|
| Approval not required - no conditions on action |
194
|
725
|
| Being processed at the end of Financial Year |
29
|
N/A
|
| CONTROLLED ACTIONS | ||
| Total controlled actions (after reconsiderations) |
54
|
290
|
| Assessments completed |
27
|
106
|
| Under bilateral agreements |
0
|
3
|
| Preliminary documentation |
21
|
80
|
| Public environment report |
0
|
1
|
| Environmental impact statement |
1
|
6
|
| Public inquiry |
0
|
0
|
| Accredited assessment |
5
|
16
|
| Approval decisions |
27
|
87
|
| Approved with no conditions |
1
|
8
|
| Approved with conditions |
25
|
77
|
| Approval not granted |
1
|
2
|
| Table 2: Referrals, decisions on controlled actions and reconsideration of decisions | |
|---|---|
| Referrals | |
| Referrals received |
292
|
| Deemed referrals |
0
|
| Referrals withdrawn or lapsed before decision |
8
|
| Referrals decisions made (initial decision, before reconsiderations) | |
| Approval required - controlled action |
57
|
| Approval not required - action to be taken in particular manner |
36
|
| Approval not required - not controlled action |
193
|
| Total |
286
|
| Referrals being processed at 1 July 2003 |
27
|
| Referrals being processed at 30 June 2004 |
29
|
| Reconsideration of decisions | |
| Reconsiderations decisions made in 2003-4 | |
| No change in decision |
5
|
| Controlled action decision to not controlled action |
2
|
| Controlled action decision to action to be taken in particular manner |
6
|
| Not controlled action decision to action to be taken in particular manner |
2
|
| Not controlled action decision to controlled action |
0
|
| Manner specified decision to not controlled action |
0
|
| Total |
15
|
| Reconsiderations pending at 30 June 2004 |
3
|
| Table 3: Referrals and decisions made by jurisdiction (a)Referrals and decisions made by jurisdiction | |||||
|---|---|---|---|---|---|
| Referrals received in 2003-04 | Decisions made in 2003-04 | ||||
| Approval required | Approval not required | ||||
| CA(b) | PM(c) | NCA(d) | Total | ||
| NSW |
57
|
8
|
4
|
52
|
121
|
| VIC |
60
|
10(e)
|
8
|
40
|
108
|
| QLD |
73
|
13
|
10
|
45
|
141
|
| WA |
26
|
8
|
1
|
17
|
52
|
| SA |
17
|
1
|
3
|
11
|
32
|
| TAS |
13
|
0
|
5
|
7
|
25
|
| NT |
9
|
5
|
0
|
4
|
18
|
| ACT |
14
|
2
|
0
|
10
|
26
|
| Jervis Bay Territory |
1
|
0
|
0
|
1
|
2
|
| Antarctica |
1
|
1
|
0
|
0
|
2
|
| Territories |
8
|
2
|
1
|
5
|
16
|
| Commonwealth Marine Areas |
13
|
4
|
6
|
2
|
25
|
| Total |
292
|
54
|
38
|
194
|
286
|
(a) The counts of referrals received and of decisions made relate to events occurring in 2003-04. Decisions made may relate to referrals received in earlier years.
(b) CA means that the action is a controlled action.
(c) PM (particular manner) refers to decisions made by the Minister under section 77(3) that an action is not a controlled action because of the particular manner in which it will be taken.
(d) NCA means that the action is not a controlled action.
(e) Includes one withdrawn.
| Table 4. Referrals and decisions made by activity category | |||||
|---|---|---|---|---|---|
| Referrals received in 2003-04 | Decisions made in 2003-04 | ||||
| Approval Required |
Approval not required | ||||
| CA(a)CA | PM(b)PM | NCA(c)NCA | Total | ||
| Agriculture and forestry |
5
|
0
|
1
|
4
|
5
|
| Air and space transport |
4
|
2
|
1
|
0
|
3
|
| Aquaculture |
7
|
3
|
0
|
5
|
8
|
| Communication |
6
|
0
|
0
|
7
|
7
|
| Defence |
5
|
2
|
0
|
2
|
4
|
| Energy generation and supply |
20
|
5
|
6
|
14
|
25
|
| Exploration (mineral, oil, gas) |
17
|
3
|
9
|
4
|
16
|
| Land transport |
29
|
4
|
5
|
19
|
28
|
| Manufacturing |
4
|
0
|
0
|
4
|
4
|
| Mining |
30
|
12(d)
|
0
|
17
|
17
|
| Sale or lease of Commonwealth property |
4
|
1
|
0
|
4
|
5
|
| Science, research and investigations |
2
|
0
|
1
|
1
|
2
|
| Tourism, recreation and conservation management |
36
|
6
|
4
|
25
|
35
|
| Urban and commercial new development |
70
|
10
|
10
|
47
|
67
|
| Urban and commercial redevelopment |
11
|
1
|
0
|
9
|
10
|
| Waste management |
12
|
1
|
0
|
10
|
11
|
| Water management and use |
22
|
3
|
1
|
17
|
21
|
| Water transport |
8
|
1
|
0
|
5
|
6
|
| Grand Total |
292
|
54
|
38
|
194
|
286
|
(a) CA means that the action is a controlled action.
(b) PM (particular manner) refers to decisions made by the Minister under section 77(3) that an action is not a controlled action because of the particular manner in which it will be taken.
(c) NCA means that the action is not a controlled action.
(d) Includes one withdrawn.
| Table 5: Number of matters protected by the EPBC Act for which adverse impacts have been addressed | |||
|---|---|---|---|
| Matter protected | Nominal controlled action(a)Nominal controlled action | Controlled action |
|
| Division 1 | Matters of National Environmental Significance | ||
| Section 12 | World Heritage values of a World Heritage property |
3
|
6
|
| Section 16 | Ecological character of a declared Ramsar Wetland |
3
|
12
|
| Section 18 | Listed threatened species or ecological community |
32
|
45
|
| Section 20 | Listed migratory species |
14
|
31
|
| Section 21 | Nuclear activities with a significant impact on the environment |
0
|
0
|
| Section 23 | Commonwealth marine environment |
8
|
7
|
| Division 2 |
Proposals involving the Commonwealth | ||
| Section 26 | Commonwealth land |
0
|
3
|
| Section 28 | Commonwealth or Commonwealth agency activity |
1
|
4
|
| Total |
61
|
108
|
|
(a) Arising from a non-controlled action decision made if the action is taken in a particular manner
| Table 7: Approvals | |
|---|---|
| Number | |
| Approvals(a)Approvals | |
| Approved with no conditions |
1
|
| Approved with conditions |
25
|
| Approval not granted |
1
|
| Total decisions |
27
|
| Awaiting approval at 30 June 2004 |
2
|
| Commonwealth awaiting s130(1B) notice from state/territory(a)Commonwealth awaiting s130(1B) notice from state/territory |
14
|
(a) The statutory timeframe for the approval process commences with the finalisation of an assessment report and, where necessary, the receipt of a notice from the relevant state/territory stating that the impacts of the action (other than those impacts assessed in accordance with the EPBC Act) have been assessed by the state or territory. Therefore for some proposed actions, although the assessment process is complete, the approval process statutory timeframe cannot commence until such notices from the state or territory are received under section 130(1B).
| Table 8: Advice provided under Section 160 | |||
|---|---|---|---|
| Authorisation provision | Requests for advice | Assessment completed | Advice provided |
| Foreign aid program |
0
|
0
|
0
|
| Aviation airspace management plan |
0
|
0
|
0
|
| Airport major development plan |
11
|
6(a)6
|
6
|
| Reg 6.01 - Sea dumping permit |
1
|
0
|
0
|
| Total |
12
|
6
|
6
|
(a) Includes four accredited assessments.
Approvals granted during 2003-04
ADI Limited - Modernisation of Mulwala Munitions Plant, Mulwala, NSW
Brisbane City Council - Sandgate Treatment Plant, Sandgate, QLD
Comalco Smelter Development Pty Ltd and Boyne Smelters Limited (BSL) - Aluminium Smelter Expansion, Gladstone, QLD
Department of Defence - Training Exercise, Shoalwater Bay, QLD
Enertrade - Gas pipeline, Moranbah-Townsville, QLD
Forresters Glen Pty Ltd - Retirement village, Forresters Beach, NSW
G and H Pedel - Residential Building, Kingston, Norfolk Island
Gastech Systems - Tassie Shoal LNG Project, Timor Sea
German Creek East Joint Venture - German Creek Coal Mine Extension, Middlemount, QLD
Gosford City Council - Vegetation Clearing, Umina Beach, NSW
JC, SL, TJ and SN Adam - Clearing Vegetation for Irrigation System, Bringalbert, VIC
New South Wales Land and Housing Corporation - Residential Development, Kellyville, NSW
Newfield Australia (Ashmore Cartier) Pty Ltd - Oil and Gas Wells, Timor Sea
Nexen Petroleum Australia Pty Ltd - Decommissioning of Buffalo Oil Field, Timor Sea
Pacific Reef Fisheries Pty Ltd - Alva Beach Prawn Farm, Alva Beach, QLD
Portman Iron Ore Ltd - Mt Jackson, Windarling and Bungalbin deposits, Koolyanobbing, WA
Qld Department of Main Roads - Widening of Leichhardt Highway, Condamine and The Gums, QLD
Ravensthorpe Nickel Operations Pty Ltd - Ravensthorpe Nickel Project, Ravensthorpe, WA
Rivers and Water Supply Commission - Meander River Dam, Meander, TAS
Riviera Properties Ltd - Riviera Harbours Development, Paynesville, VIC
Vic Roads - Pakenham Bypass, VIC
Warkworth Mining Limited - Extending Warkworth Coal Mine, Warkworth, NSW
Waterways Authority - Sand Reclamation, Towra Point Nature Reserve, Botany Bay, NSW
Wesfarmers Curragh Pty Ltd - Curragh North Coal Mine, Duaringa Shire, QLD
Woodside Energy Ltd - Otway Development, Otway Basin, VIC
Woodside Energy Ltd - Full Field Development, Offshore North West Cape, WA
Yarra Valley Golf Pty Ltd - Henley Golf Course development, Healesville, VIC
Assessments completed during 2003-04
Assessed through environmental impact statement
Woodside Energy Ltd - Otway Development, Otway Basin, VIC
Assessed through preliminary documentation
Axseven Pty Ltd - Black Tiger Prawn Farm, Micalo Island, NSW
Department of Defence - Training Exercise, Shoalwater Bay, QLD
Forrester Residential Developments - Subdivision development, Peregian Beach, QLD
Forresters Glen Pty Ltd - Retirement village, Forresters Beach, NSW
G and H Pedel - Residential Building, Kingston, Norfolk Island
Gastech System - Tassie Shoal LNG Project, Timor Sea
German Creek East Joint Venture - German Creek Coal Mine Extension, Middlemount, QLD
Gosford City Council - Vegetation Clearing, Umina Beach, NSW
Information Gateways Pty Ltd - Rural residential subdivision, Duffys Forest, NSW
JC, SL, TJ and SN Adams - Clearing Vegetation for Irrigation System, Bringalbert, VIC
Newfield Australia (Ashmore Cartier) Pty Ltd - Decommissioning of Challis Oilfield, Timor Sea
Newfield Australia (Ashmore Cartier) Pty Ltd - Oil and Gas Wells, Timor Sea
Nexen Petroleum Australia Pty Ltd - Decommissioning of Buffalo Oil Field, Timor Sea
Provent Property Group Pty Ltd - Residential Subdivision, Duffys Forest, NSW
Riviera Properties Ltd - Riviera Harbours Development, Paynesville, VIC
Santos Lt - Alston-1 petroleum exploration well, Otway Basin
Santos Ltd - Casino Gas Field Development, Otway Basin
Wambo Coal Pty Limited - Wambo Coal Mine Development Project Hunter Valley, NSW
Waterways Authority - Sand Reclamation, Towra Point Nature Reserve, Botany Bay, NSW
Wesfarmers Curragh Pty Ltd - Curragh North Coal Mine, Duaringa Shire, QLD
Yarra Valley Golf Pty Ltd - Henley Golf Course development, Healesville, VIC
Assessed through accredited process
ADI Limited - Modernisation of Mulwala Munitions Plant, Mulwala, NSW
Comalco Smelter Development Pty Ltd and Boyne Smelters Limited (BSL) - Aluminium Smelter Expansion, Gladstone, QLD
Transtate - Port of Airlie Integrated Resort and Marina Development Airlie Beach, QLD
Vic Roads - Pakenham Bypass, VIC
Warkworth Mining Limited - Extending Warkworth Coal Mine, Warkworth, NSW
Assessments in progress at 30 June 2004
Environment Impact Statement
ChevronTexaco Australia - Gorgon Gas Development, Barrow Island, WA
Department of Defence - Headquarters Australian Theatre, Bungendore, NSW
Epic Energy - Darwin to Moomba Gas Pipeline
Phosphate Resources Ltd - East Christmas Island Phosphate Mines, Christmas Island
Powerlink Queensland - High Voltage Electricity Transmission Line Innisfail, QLD
Shell Development (Australia) Pty Ltd - Floating Liquefied Natural Gas facility, Timor Sea
TGS-NOPEC Geophysical Company - 2-D seismic survey Townsville Trough
TransGrid - Electricity Transmission Line, Buronga (NSW) to Monash (SA)
Woodside Energy Limited - Development of Blacktip Gas Field, Joseph Bonaparte Gulf
Public Environment Reports
Cooloola Shire Council - Construction of New Landfill, Toolara, QLD
Coral Coast Marina Development Pty Ltd - Mauds Landing Marina, WA
Cultus Timor Sea Pty Ltd - Audacious Oil Field Standalone Development, Timor Sea
HEZ Pty Ltd - Development of the Hunter Economic Zone Industrial Estate, NSW
Mr K Williams & Cardwell Properties Pty Ltd - Port Hinchinbrook Resort Stage II Cardwell, QLD
Mr Stephen Lane - Public Ferry Hovercraft Operation, Cocos Keeling Island
Phosphate Resources Ltd - Exploration for Mineable Phosphate, Christmas Island
Roc Oil (WA) Pty Limited - platform at the Cliff Head oil field, Dongara, WA
Sudaw Developments Ltd - Nathan Dam, Dawson River, QLD
Waterman Agriculture Pty Ltd - Irrigated cotton development expansion, Pillicawarrina, NSW
Preliminary documentation
Department of Finance and Administration - Divestment of York Park North, Barton, ACT
Department of Infrastructure, Planning and Natural Resources - Pipeline construction and environmental water flow management, Great Darling Anabranch, NSW
Hinchinbrook Shire Council - Sand Bag Groyne construction, Dungeness Point, Lucinda, QLD
Liverpool City Council - Lyn Parade Extension, Prestons, NSW
Palmela Holdings - One Tree Hill Estate - Stage 13, Tamworth, NSW
Phosphate Resources Ltd - Phosphate salvage, transport and processing, Christmas Island
Pioneer Construction Materials Pty Ltd - Sand Quarry Depth Extension, Blue Mountains, NSW
ROCLA LTD - Kurnell Sand Extraction and Backfilling Proposal, Kurnell Peninsula, NSW
Simon Builders Pty Ltd - 'Fairway Waters' Retirement Village, Pakenham, VIC
Southern Hydro Partnership - Rocky Valley Dam Expansion, Falls Creek, VIC
Tidal Energy Australia - Derby Tidal Power Proposal, WA
Woromar Pty Ltd - Rural Sub-division, Bredbo, NSW
Assessments under a bilateral agreement
Hydro Tasmania - Heemskirk Windfarm Development, West Coast, TAS
Hydro Tasmania - Energy generation and supply, Cape Portland Property, TAS, Musselroe Wind Farm
Kemerton Silica Sand Pty Ltd - Silica Sand Mine Expansion, Kemerton, WA
MIM Holdings Limited - McArthur River Mine Expansion, NT
Pacific Hydro Limited - White Rock Ridge Wind Farm, Robbins Island, TAS
Woodside Energy Limited and Alcan Gove Pty Ltd - Trans-territory Gas Pipeline, Wadeye to Gove, NT
Assessments under an Accredited Process
Austeel Pty Ltd - Steel Mill, Newcastle, NSW
Bendigo Mining NL - Carshalton Mine Expansion, Bendigo, VIC
Bulga Coal Management Pty Ltd - Bulga Underground Coal Mine Extension, Singleton, NSW
Burnett Water Pty Ltd - Walla Weir, Bundaberg, QLD
City of Cockburn - Extension of Beeliar Drive, Cockburn, WA
Compass Resources NL - Polymetallic Project, Rum Jungle, NT
Hamilton Island Enterprises Limited - Golf Course Development, Dent Island, QLD
Hazelwood Power - West Mine Development, Latrobe Valley, VIC
Lake Wellington Estates - Wellington Waters Canal Estate, Wellington Lakes, VIC
LG Chem Ltd - Ethylene Di-Chloride plant, Gladstone, QLD
Lonsdale Golf Club Inc - Lonsdale Golf Club Redevelopment, Point Lonsdale, VIC
Mineral Deposits Pty Ltd - Mineral sand mining, McGuires Crossing, NSW
Mineralogy Pty Ltd - Iron Ore Project, Preston, WA
Mount Gibson Mining Limited - Mine and Beneficiation Plant, Mount Gibson, WA
Murray Basin Titanium - Prungle Project Mineral Sand Mine, Euston, NSW
Murray Basin Titanium Pty Ltd - Twelve Mile mineral sand mine, Willandra Lakes, NSW
Newcastle Port Corporation - Hunter River south arm dredging, Newcastle, NSW
Newnes Kaolin Pty Limited - Newnes Kaolin Sandstone Mine Project, Newnes Junction, NSW
NSW Roads and Traffic Authority - Pacific Highway, Upgrade, Bulahdelah, NSW
NSW Roads and Traffic Authority - Road Upgrade, Nowra-Nerriga, NSW
NSW State Government - Hunter River Port and Transport Corridor, Newcastle, NSW
Orange City Council - Resource Reprocessing Facility, Molong, NSW
Pacific Coal Pty Ltd - Open-Cut Coal Mine, Clermont, QLD
Pacific Reef Fisheries Pty Ltd - Proposed Guthalungra Aquaculture Facility, Guthalungra, QLD
PF Formation - Sand Extraction, Maroota, NSW
Port of Melbourne Corporation - Port Phillip Bay Channel Deepening, VIC
RMI Pty Ltd - Irrigated intensive crop production, Macintyre River, NSW
Selwyn Mines Limited - Selwyn Copper-Gold Project, Mt Isa-Carpentaria, QLD
Shute Harbour Management Pty Ltd - Construction of marina, Shute Harbour, QLD
Stockland Development Pty Ltd - Residential and Golf Course Development, Point Lonsdale, VIC
Sun Aqua Pty Ltd - Seacage Snapper Farming, Moreton Bay, QLD
Sydney Ports Corporation - Expansion of Port Botany facilities, NSW
WA Main Roads - Roe Highway Extension, South Perth, WA
Wind Power Pty Ltd - Bald Hills Wind Farm 80 Turbines, Bald Hills, VIC
Wind Power Pty Ltd - Wind Turbines, Swan Bay, VIC
Conserving Biodiversity
Threatened species and ecological communities
| Table 9: Processing of nominations and changes to the lists of threatened species, ecological communities and key threatening processes (as at 10 May 2004)(a)Table 9 | ||||||
|---|---|---|---|---|---|---|
| Species | Ecological communities | Key threatening processes | ||||
| New public(b)New public nominations received under the Act |
21
|
5
|
2
|
|||
| Nominations on which the Threatened Species Scientific Committee has provided advice to the Minister |
56
|
0
|
0
|
|||
| Threatened Species Scientific Committee advice to the Minister carried over from 2002-03 |
6
|
2
|
4
|
|||
| Ministerial decisions made on Threatened Species Scientific Committee advice |
56
|
0
|
4
|
|||
| Number uplisted, new, delisted, rejected |
1, 53, 0, 2
|
0, 0, 0, 0
|
0, 1, 0, 3
|
|||
| Number of amendments to the list |
54
|
0
|
1
|
|||
| Total number of listings as at 4 May 2004 |
1663
|
29
|
14
|
|||
| Number of public(b)Number of public nominations where an extension to the 12-month timeframe was required(c)nominations |
17
|
2
|
2
|
|||
| Number of Ministerial decisions made on Threatened Species Scientific Committee Advice where the Minister's 90-day deadline was met |
Yes(d)
|
No
|
Yes
|
No
|
Yes
|
No
|
|
55
|
1
|
0
|
1
|
4
|
0
|
|
(a) Anomalies in the data can be attributed to the continuing assessment of nominations that occurs across financial years.
(b) Excludes nominations or advices derived from information taken from action plans and consultants reports
(c) Extensions were granted on all nominations that were delayed.
(d) Excludes advices that are currently with the Minister for decision, for which the 90-day deadline has not been exceeded.
Whales and other cetaceans
| Table 10: Cetacean permits | |||
|---|---|---|---|
| Sub-section(a)Sub-section | Applications received | Decision made on assessment approach | Permits granted |
| Sub-section 238(3)(a) - specified actions which will contribute significantly to the conservation of cetaceans |
0
|
0
|
0
|
| Sub-section 238(3)(b) - interference incidental to, and not the purpose of, the taking of the action |
10
|
9
|
9
|
| Sub-section 238(3)(c) - whale watching |
1
|
0
|
0
|
| Sub-section 238(3)(d) - export of a personal item |
1
|
1
|
1
|
| Sub-section 238(3)(e) - import of a personal item |
4
|
4
|
4
|
| Total |
16
|
14
|
14
|
(a) Some applications received were for multiple sub-sections.
Commonwealth and state managed fisheries
| Table 11: Assessments of Commonwealth and state managed fisheries completed 2003-04 | ||
|---|---|---|
| State/Commonwealth | Fishery | Ministerial/delegate decision date |
| NT | Finfish Trawl Fishery | 18 April 2004 |
| NT | NT Demersal Fishery | 16 April 2004 |
| VIC | Abalone Fishery | 21 July 2003 |
| VIC | Rock Lobster Fishery | 24 March 2004 |
| VIC | Giant Crab Fishery | 19 March 2004 |
| VIC | Pang Quong Aquatics | 17 December 2003 |
| VIC | Eel Fishery | 7 May 2004 |
| WA | Pearl Oyster | 27 October 2003 |
| WA | Shark Bay Snapper | 7 June 2004 |
| WA | West Coast Deep Sea Crab Fishery | 19 March 2004 |
| Commonwealth | Northern Prawn Fishery | 9 January 2004 |
| Commonwealth | Southern and Eastern Scale-fish and Shark Fishery (WTO) | 19 December 2003 |
| NSW | Estuary Prawn Trawl Fishery | 9 December 2003 |
| TAS | Giant Crab Fishery (WTO) | 24 July 2003 |
| TAS | Native Oyster Fishery (WTO) | 28 April 2004 |
| SA | Rock Lobster | 31 October 2003 |
| SA | Giant Crab Fishery | 19 March 2004 |
| SA | Seahorse Marine Services | 17 June 2004 |
| SA | Abalone - Blacklip and Greenlip | 10 June 2004 |
Before you download
Most publications are available as PDF files. Adobe Acrobat Reader is required to view PDF files.
If you are unable to access a publication, please contact us to organise a suitable alternative format.
Key
Links to another web site
Opens a pop-up window